{"id":5649,"date":"2024-12-23T09:06:16","date_gmt":"2024-12-23T03:36:16","guid":{"rendered":"https:\/\/lakshmishree.com\/news\/?p=5649"},"modified":"2024-12-23T09:06:17","modified_gmt":"2024-12-23T03:36:17","slug":"ntpc-green-energy-in-focus-after-signing-mou-for-renewable-energy-projects-in-bihar","status":"publish","type":"post","link":"https:\/\/lakshmishree.com\/news\/ntpc-green-energy-in-focus-after-signing-mou-for-renewable-energy-projects-in-bihar\/","title":{"rendered":"NTPC Green Energy in Focus After Signing MoU for Renewable Energy Projects in Bihar"},"content":{"rendered":"\n<p>NTPC Green Energy&#8217;s share price is likely to remain in focus on December 23 following the signing of a Memorandum of Understanding (MoU) with the Department of Industries, Government of Bihar. The agreement aims to boost renewable energy investments in the state, encompassing projects like ground-mounted and floating solar installations, battery energy storage systems, and green hydrogen mobility initiatives.<\/p>\n\n\n\n<p>The Bihar government will assist NTPC Green Energy in securing necessary permissions, approvals, and clearances to facilitate these projects.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Recent Developments in NTPC Green Energy<\/strong><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Solar Project Operations in Gujarat<\/strong>:<br>Last week, NTPC Green Energy began the commercial operation of a 30 MW solar unit, part of a larger 150 MW Gujarat Solar PV Project at Mesanka. The project is managed by NTPC Renewable Energy, a wholly owned subsidiary of NTPC Green Energy.<\/li>\n\n\n\n<li><strong>Major Win in SECI Auction<\/strong>:<br>On December 10, NTPC Renewable Energy emerged as a successful bidder in an e-reverse auction conducted by the Solar Energy Corporation of India (SECI).\n<ul class=\"wp-block-list\">\n<li>The auction involved the development of 2000 MW of ISTS-connected solar PV power projects.<\/li>\n\n\n\n<li>It also required establishing Energy Storage Systems (ESS) with a total capacity of 1000 MW\/4000 MWh.<\/li>\n\n\n\n<li>NTPC Renewable Energy secured 500 MW of solar capacity at a tariff of \u20b93.52 per kWh and will set up an ESS of 250 MW\/1000 MWh along with the solar capacity.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Stock Performance<\/strong><\/h3>\n\n\n\n<p>NTPC Green Energy was listed on the NSE at \u20b9111.50 per share, reflecting a premium of 3.24% over its IPO price of \u20b9108 per share.<\/p>\n\n\n\n<p>As a &#8216;Maharatna&#8217; central public sector enterprise, NTPC Green Energy is committed to expanding its renewable energy portfolio, which includes solar and wind power assets, to support India&#8217;s clean energy goals.<\/p>\n\n\n\n<p>Do you have a news tip for Lakshmishree reporters? Please email us at <strong><a>media@lakshmishree.com<\/a><\/strong><\/p>\n\n\n\n<p><sup><sub><strong>Source<\/strong>: <a href=\"https:\/\/www.moneycontrol.com\/news\/business\/stocks\/ntpc-green-energy-shares-in-focus-on-signing-mou-for-renewable-energy-projects-12895536.html\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.moneycontrol.com\/news\/business\/stocks\/ntpc-green-energy-shares-in-focus-on-signing-mou-for-renewable-energy-projects-12895536.html\" rel=\"noreferrer noopener\">Moneycontrol<\/a><\/sub><\/sup><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NTPC Green Energy&#8217;s share price is likely to remain in focus on December 23 following the signing of a Memorandum of Understanding (MoU) with the Department of Industries, Government of Bihar. The agreement aims to boost renewable energy investments in the state, encompassing projects like ground-mounted and floating solar installations, battery energy storage systems, and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5650,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[50],"tags":[661],"class_list":["post-5649","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-indian-market","tag-ntpc-green-energy"],"_links":{"self":[{"href":"https:\/\/lakshmishree.com\/news\/wp-json\/wp\/v2\/posts\/5649","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lakshmishree.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lakshmishree.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lakshmishree.com\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lakshmishree.com\/news\/wp-json\/wp\/v2\/comments?post=5649"}],"version-history":[{"count":1,"href":"https:\/\/lakshmishree.com\/news\/wp-json\/wp\/v2\/posts\/5649\/revisions"}],"predecessor-version":[{"id":5651,"href":"https:\/\/lakshmishree.com\/news\/wp-json\/wp\/v2\/posts\/5649\/revisions\/5651"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lakshmishree.com\/news\/wp-json\/wp\/v2\/media\/5650"}],"wp:attachment":[{"href":"https:\/\/lakshmishree.com\/news\/wp-json\/wp\/v2\/media?parent=5649"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lakshmishree.com\/news\/wp-json\/wp\/v2\/categories?post=5649"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lakshmishree.com\/news\/wp-json\/wp\/v2\/tags?post=5649"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}